
A 5-lot lifestyle subdivision with formed vehicle crossings, power supply and fencing. Located at the entrance of Woodville, a 2 minute drive from the Woodville Town Centre and a 20-minute drive to Palmerston North City through the new State Highway being constructed.
A 5-lot lifestyle subdivision with formed vehicle crossings, power supply and fencing. Each lot will have a minimum site area of 5000m2 to allow for on-site servicing.
- A thorough flood impact assessment to be carried out to determine the finished floor levels of any future buildings
- Formed vehicle crossings to each site off Troup Road
- Stormwater pond and vegetation buffer
Works to commence in June 2025 and scheduled to complete by September 2025.
